- Product Categories
- Friendly Links
Information Name: | Automatic multi-stage pre-vacuum Autoclave |
Published: | 2006-11-17 |
Validity: | 180 |
Specifications: | Length 53 x width 39 x 42 high (cm) |
Quantity: | 0.00 |
Price Description: | Negotiable |
Detailed Product Description: | NewClave Autohouse AD7-1-3A Technology humanity! Achievements of a better life! 1 "double doors buckle design: The second door design doors block device, during the drying process, the door will automatically open the doors to file will prevent the second door is fully open, to avoid residual vapor within the tank moment emerge wounding, this second heavy door block design, the door automatically opens, only part of the maintenance door ajar, so that the smooth discharge of steam drying process. 2 "Security close Display: Right after the door shut properly, DOOR AJAR signal lights will go out, we can machine the next action command. If the door is not closed properly, the machine can not move. 3 "Auto Component Test: When the machine turned on, an internal component that automatically tests, sequential panel LED indicator will flash once. 4 "Debug indicator: DOOR AJAR (door was not closed properly): bright the lights, that must be re-shut the door entirely properly. WATER LOW (low level): If the program for 6 minutes after the lights are still lit (will sound warning), Storage tank that must be wiped clean with a clean cloth, then re-add enough distilled water or pure water. Error (Fault Display): There are four fault display screen, E1, E2, E3, E4. 5 "a number of disinfection options: unpacked object disinfection, disinfection procedures bag object, liquid disinfecting and bandaging (cloth tied to) the object of sterilization procedures. |
You are the 5212 visitor
Copyright © GuangDong ICP No. 10089450, Ya Boda Trading Company (Commerce) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility